Waterfront & Marine

HRPT Pier 98-99 Marine Platform

Manhattan, New York

Project Overview

MFS Engineers & Surveyors provided professional surveying and engineering services to the client in support of this project. The project site, located along the Hudson River Greenway between HRPT Pier 98 and 99, contains a sanitation facility and Con Edison employee parking. Planned construction consists of a new 190-foot-long by 20-foot-wide pile supported platform between the piers.

Hudson River Park Trust Pier 98 99 2
Hudson River Park Trust Pier 98 99 1
Manhattan, New York

Project Details

MFS' Survey team support included surveying physical features such as seawall, face of pier, walls, railing, mooring hardware, timber attached to the seawall/piers, and other items that may be along the seawall/piers.

Meanwhile the geotechnical team performed a desktop study to evaluate the subsurface conditions in the vicinity of HRPT pier 98-99, following the study with a design soil profile to analyze the piles to be used to support the new platform on site.

Stats

  • Owner:
    Hudson River Park Trust (HRPT)
    • Client:
      Moffat & Nichols (M&N)

Services Provided

  • MFS provides land surveying services throughout the tri-state area, specializing in site surveying, boundary surveys, topographical surveys, and utility surveys. One of the top surveying companies in NJ, we have extensive experience in real estate, infrastructure, utility, transportation and more.
  • MFS provides professional geotechnical engineering services including geotechnical investigation and subsurface exploration, soil engineering services, and permeability testing.